MK Palayam road: Not a smooth ride

Poor condition of MK Palayam road irks residents

May 27, 2015 12:00 am | Updated 11:14 am IST - COIMBATORE:

A portion of the damaged Masakalipalayam Road in the city. —Photo: S. Siva Saravanan

A portion of the damaged Masakalipalayam Road in the city. —Photo: S. Siva Saravanan

Be it the Masakalipalayam Road, the streets that branch off it on the east and west or the lanes that branch off from those streets, there has never been an occasion in the past year or so when road users have had a smooth ride.

Their bumpy rides, avoidable damage to the bottoms of cars and much more began when the Coimbatore Corporation completed the work but failed to restore the road – restoration means dumping the dug earth into the trenches where the underground drainage pipelines are buried.

This has left unfit for use those portions of the roads where the underground pipelines are laid and battered where the works were not taken up. The worse are those areas around the manhole lid, says R. Krishnaveni, a resident.

While the lids protrude out, the area surrounding them are without earth, making the area very dangerous for road users. The area around manhole lids have been the cause of several accidents, complains R. Ramasamy, also a resident.

The Corporation taking up the storm water drain have only added up to the problem, adds Ms. Krishnaveni.

In the nearby Rajalakshmi Nagar, the situation is no different. It will only make news only if the Corporation were to construct roads there, for the residents have become so used to the bad roads, quips resident A. Selvaraj.

In short, the roads in the localities on the east and west of Masakalipalayam Road resemble the paniaram plate, rues Mr. Ramasamy.

The Corporation needs to repair the roads at the earliest, if not the Kongunadu Jananayaka Katchi will be forced to stage a protest by running bullock carts on the roads to highlight the rather pathetic condition, says G.K. Nagaraj, founder-president.

The party took up the issue with Mayor P. Rajkumar and there was some result in that the civic body took up patch work but that is not enough. The area needs new, well-built roads, he says and adds that the quality of the roads should be such that they withstand heavy vehicle movement, for buses to Singanallur use those to avoid the Hope College Junction.

Coimbatore Corporation officials say the Council has sanctioned over Rs. 50 lakh for the roads in the area and the work will begin soon.

0 / 0
Sign in to unlock member-only benefits!
  • Access 10 free stories every month
  • Save stories to read later
  • Access to comment on every story
  • Sign-up/manage your newsletter subscriptions with a single click
  • Get notified by email for early access to discounts & offers on our products
Sign in

Comments

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.