Several trains moving via Mangaluru Junction, including Train No. 12133/12134 Mumbai CST–Mangaluru Junction–Mumbai CST would have delayed operations on Sunday due to line-blocking to allow for construction of a subway at Jokatte between Padil and Thokur stations.
Releases from Southern and Konkan Railway here said the line block would be operational between 10.30 am and 2.30 pm, necessitating regulating some trains.
Train No. 12133 Mumbai CST–Mangaluru Junction Express, would arrive at the Junction only at 2.55 pm as against normal arrival time of 12.40 pm. Consequently, departure of its pairing train-12134 to Mumbai would be delayed. It would leave Mangaluru Junction at 4.15 pm instead of scheduled departure time of 1.55 pm.
Train No. 16337 Okha–Ernakulam Express, scheduled to arrive at Mangaluru Junction at 1.40 pm, would be running late by 120 minutes. Train No. 22634 Thiruvananthapuram–Nizamuddin Superfast Express, scheduled to arrive at Mangaluru Junction at 2.40 pm, would be running late by 85 minutes.